-
Re: Grade Poppage Thread (Through-Date Estimation)
I have 38 orders left...37 of them are graded and have been in assembly for at least 3 weeks up to 5 weeks for some. Not even a 1 has hit qa1. For reference, all of these orders were entered between … (View Post)1 -
FS: ...Rare Box Mint Factory Sealed 2004-05 Topps 1st Edition HTA Basketball - $850
Updated with a clean slate 12/12 (View Post)3 -
Re: Grade Poppage Thread (Through-Date Estimation)
I second that...this is more like it TOTAL ITEMS 22 DATE RECEIVED 1/12/2021 DATE SHIPPED 9/16/2021 Line # Item # Cert # Grade Description Type 1 1 53575649 GEM MINT 10 1991 Fleer All-Pro 10 Bo Jackso… (View Post)5 -
Re: Grade Poppage Thread (Through-Date Estimation)
I've got 80 orders that were entered in march of which a total of zero have as much as entered the grading phase yet...those guys in the research dept must really have their hands full! I'm just bein… (View Post)1 -
Re: Grade Poppage Thread (Through-Date Estimation)
Had it been productive on the bulk subs having been there 7-8-9 months now it'd be tolerable to an extent but you're figures are right on par w mine as I have a couple hundred smaller orders w 30-50 … (View Post)7